Waste Water Capacity
- The Oneida County Department of Water Quality and Water Pollution Control guarantees 3 MGD capacity immediately, with the ability to increase to 5.4 MGD.
Wastewater Treatment Plant capacity
- 40–48 mgd (seasonal).
- Existing facility has capacity to accept 3 mgd of additional flow.
- Sewer upgrades and reduction in infiltration and inflow necessary to handle flow from 2 major semiconductor facilities
Wastewater Infrastructure
- Wastewater conveyed by gravity flow (no pump-station required).
- 36” transmission main exists 4,600 feet from site.
Proposed Sewer Improvements:
- Off-site:
- 4,600 LF of 18” PVC from 36” main to project site.
- On-site:
- 8,780 LF of 8” PVC.
- Construction of pre-treatment plant.